top
  • sarvodya

Umang Realtech

Monsoon Breeze Phase II

Umang Realtech

I am Intersted

You Get Assured Call in 5 mins*
Name:          
Contact No:  

 

  Project Discriptions:
Monsoon Breeze Phase 2 is a fresh residential project (Residential Apartments) launched by Umang Realtech in the Sector -78 Gurgaon. Monsoon Breeze Phase 2 is launching best location in Gurgaon. This is luxury and comfort residential projects in Gurgaon. Monsoon Breeze Phase 2 is available in the options of residential apartments like 2 BHK, 3 BHK and 4 BHK. The basic Sale price of Monsoon Breeze Phase 2 is Rs 5375/- psf for 3BHK and Rs 5050/- psf for 4BHK but this is not a fix price of this project. it is possible to increase price kindly call 1800 208 1010 (Toll Free) to confirm the price of the Monsoon Breeze Phase 2. Monsoon Breeze II is supported with various features and amenities like swimming pool, exclusive club house, featured security, complete power backup and landscaped gardens with many more.

Umang Monsoon Breeze Phase 2 is a upcoming residential project in Sector 78 Gurgaon. Umange Monsoon Breeze Phase 2 is designed to full fill the luxury quotient of the living purpose. This is the unique design and structure in the Gurgaon. The infrastructure of this residential project is world class. Umang monsoon breeze phase 2 is prime location in sector 78 Gurgaon, make commutation easy from this location.
  Specifications:
Area   Specifications
Living/Dining/
Lobby
Floors Vitrified Tiles
Walls Pleasing shades with Plastic Emulsion
  Ceiling White Wash
Bedroom Floor Mix of Wooden Laminated Flooring & Vitrified Tiles
  Walls Pleasing shades with Plastic Emulsion
  Ceiling White Wash
  Wardrobes Imported Modular factory finished Wardrobe in all Bedrooms
Balconies Floor Anti-skid Ceramic Tiles
  Walls External Paint Finish
  Ceiling External Paint Finish
Kitchen Modular Kitchen Wooden Laminated Modular Cabinets
  Walls Ceramic tiles above the counter & OBD in balance area
  Floor Anti skid Ceramic Tiles
  Counter Granite
  Fitting/Fixture Standard CP Fitting
  Sink SS Single Drain Board Sink
  Other Hob & Chimney
Toilets Walls Ceramic Tiles above and OBD above the tiles, as per design
  Floor Anti Skid Ceramic Tiles
  Fitting/Fixture Standard W/C & Washbasin, Mirror over the Basin
Servant Room Floors Ceramic Tiles
  Walls OBD
  Ceiling White Wash
Doors & Windows Entrance / Internal Doors Imported Modular Frames with Moulded skin Door shutter factory finished
  External Doors & Windows UPVC / Powder Coated Aluminium
  Hardware Standard Hardware Fittings
Electrical Geyser One in each Toilet with 15 Litre Capacity
  Ceiling Fan In all Rooms as per provision
  Light Fixture Bracket Light & Tube Lights with Modular Type Switches and Sockets with copper wiring in all Rooms as per provision. Provision for TV & Telephone
Miscellaneous Lift Lobby / Staircase & Common Area Flooring Indian Stone or Vitrified Tiles, as per design
  Lifts One passenger and one stretcher lift for each core as per industry standards
  Power Back-up 100% through captive diesel power generators
  Security Systems Controlled Entrance & Exit, Gated community, CCTV at Entrance and common areas. Fire Fighting System as per Government norms.
  Others Sewage Treatment plant, Water Treatment Plant & Solar Heated Water for Kitchen use only
  Air Conditioners Only provision for A/C
Recreational Facilities Club house

Indoor Game Room, Multipurpose Hall, Space for RWA office, Changing Area & Toilets, Space for Café / Restaurant with Pantry, Gymnasium

  Swimming Pool
  Outdoor Sports Facilities
  Kids Play Area
 
Disclaimer: All Floor Plans, sizes, layouts plans, artistic rendering, images and specification may undergo revision as decided by the company or Competent Authority during construction of apartments in the best interest of the development
  Amenities:
Kidís Play Area Kidís Play Area Cafeteria Cafeteria Power Back Up Power Back Up
Fire Fighting System Fire Fighting System Reserved Parking Reserved Parking
  Payment Plan:
Down Payment Plan
At the time of Registration/Booking 20% of BSP
Within 60 days (from date of booking) 75% of BSP + Car Parking + EDC + IDC+ Club Membership + PLC (if any)
On Possession 5% of BSP + Additional Charges etc.
Construction Link Plan
  For Towers upto 16/18th Floor For Towers upto 13th Floor
  At the time of Registration/Booking At the time of Registration/Booking
20% of BSP Booking amount Within 45 days/On allotment of Unit Within 45 days/On allotment of Unit
10% of BSP On start of excavation On start of excavation
7.5% of BSP + 25% of EDC +IDC On completion of Stilt floor slab On completion of Stilt floor slab
7.5% of BSP + 25% of EDC +IDC On completion of second floor slab On completion of second floor slab
5% of BSP + PLC+25% EDC+IDC On completion of fifth floor slab On completion of fourth floor slab
7.5% of BSP + Club membership+ 25% EDC+IDC On completion of eight floor slab On completion of sixth floor slab
7.5% of BSP + EEC/FFEC On completion of eleventh floor slab On completion of eight floor slab
5% of BSP + Car park On completion of fourteen floor slab On completion of tenth floor slab
10% of BSP On completion of sixteen floor slab On completion of twelfth floor slab
10% of BSP On completion of Brick work in Apartment On completion of Brick work in Apartment
5% of BSP+ Power backup On completion of Plaster Work On completion of Plaster Work
5% of BSP + IFMS + Other Charges On Possession On Possession
  Floor Plans:
 Monsoon Breeze Phase II
 Monsoon Breeze Phase II
 Monsoon Breeze Phase II
 Monsoon Breeze Phase II
 Monsoon Breeze Phase II
 Monsoon Breeze Phase II
   Project Location :
  Video:
  Slide:
  Search Project Sector Wise:
  Project Review

 

 

 1800 208 1010

Get Assured Call in
5 mins*


 
 
Home Loan