Raheja Trinity, Sector 84, Gurgaon.
The following is the gist of the project :-

2.28 acres retail cum studio residences cum commercial – located at the intersection of 60 metre sector road diving Sector 83, 84 & Dwarka Expressway.

Ground floor & first floor – retail (500 sq ft shops).

Second floor – food court.

Third floor – studio residences (700 sq ft studios – 1 BHK – double height units – with effective area of 1050 sq ft). Only 30 studio residences on offer.

Fourth, fifth, sixth, seventh floors – Commercial
  Specifications:
The brand Raheja Developers is definitely another big plus. The Specification of the project is given below:

Retail Shops
Bang On Dwarka Expressway
38 lacs onward investments
Booking amount 5 lacs
Inaugural Discount for 5 days
Great location: Near ISBT, Vatika City
  Amenities:
Cafeteria Cafeteria Power Back Up Power Back Up Fire Fighting System Fire Fighting System
Shopping Centre Shopping Centre Reserved Parking Reserved Parking Split Air Conditioner Split Air Conditioner
  Payment Plan:
Months Tentative Construction Schedule BSP EDC/IDC PLC Parking IFMS + other charges
At the Time of booking   10%        
Within 60 days of booking   15%        
On date of offer of Allotment for shop no.   5% 50 25% 25  
Within 2 months of deemed allotment On Start of Excavation work/Construction work 5% 50 25% 25  
Within 5 months of deemed allotment On Start of Foundation Laying 5%   50% 50  
Within 8 months of deemed allotment On Start of Basement Roof Slab 5%        
Within 11 months of deemed allotment On Start of Ground  Floor roof Slab 5%        
Within 14 months of deemed allotment On Start of Ist  Floor roof Slab 5%        
Within 17 months of deemed allotment On Start of 2nd Floor roof Slab 5%        
Within 19 months of deemed allotment On Start of 3rd Floor roof Slab 5%        
Within 22 months of deemed allotment On Start of 4rth Floor roof Slab 5%        
Within 25 months of deemed allotment On start of 5th floor roof slab 5%        
Within 28 months of deemed allotment On Start of Finishing work 5%        
Within 32 months of deemed allotment On Application of Occupancy Certificate 10%        
Within 36 months of deemed allotment On receipt of Occupancy Certificate 10%       100
    100% 100 100% 100 100%